- Home
- Departments
- Engineering & Public Works
- Projects & RFP Out to Bid
Projects and RFPs Out to Bid
CLICK HERE for the Urbandale Bid Postings Portal
To view plan documents after a project has been let: Click the link above and toggle the "Show Closed Bids" box near the top of the page.
Notice to Bidders
RFP’s/RFQ’s currently available:
- RFP for Custodial Services
- RFP for Banking Services
Please sign up for notifications of future postings at https://www.urbandale.org/list.aspx
| Design RFP’s and RFQ’s are available in the Urbandale Bid Postings page (link above) under the Engineering Design Services and Request for Proposals categories. |
Plan Holders List
Bid Tabulations - Recent Lettings
- Bid Tab Phase 1 Timberline
- Bid Tab Phase 2 Colby
- Bid Tab Phase 3 Parkview
- Bid Tab 2025-005 142nd Street
- Bid Tab 2026-003 65th Street
- Bid Tab 2026-005 Douglas Avenue Plantings Patricia Drive to 111th Street
- Bid Tab 2026-009 Dennis-101st Preservation
- Bid Tab 2026-010 Aurora Avenue PCC Sidewalk
- Bid Tab ADA Program 2026
- Bid Tabulation 2025 Sidewalk Program
- Bid Tabulation 2025-024 Traffic Signal Improvements
- Bid Tabulation NW Urbandale Drive - Douglas Avenue to Meredith Drive
- Bid Tabulation 2026-025 Traffic Signal Improvements
- Bid Tab 2026-013 Douglas Preservation
- Bid Tab 2026-006 Northview Park Trail
- Bid Tab 2026-014 Annual Trail Improvements
- Bid Tab 2026-011 86th St Trail Douglas Ave to Colby Woods Pkwy
- Bid Tab 2026 Sewer Lining
Bid Tabulations - Construction 2024 / 2025 Bids
- Bid Tabulation Urbandale Public Library Interior Renovation
- Bid Tabulation Fire Station 42 Improvements
- Bid Tabulation 2024-021 Walnut Creek Bank Stabilization
- Bid Tabulation 2024-021 Golf View Creek Bank Stabilization
- Bid Tabulation 2023-008 Complete Streets, Aurora Avenue and 70th Street
- Bid Tabulation 2025-007 Meredith Drive Fiber Connection
- Bid Tabulation 2024-022 Traffic Signal Improvements
- Bid Tab 2025 Sanitary Sewer Lining Program
- Bid Tab 2025-011 114th St Sidewalks
- Bid Tabulation 2024-003 Roseland Drive Storm Sewer
- Bid Tabulation 2025 ADA Improvements
- Silkwood Crossing Bid Tabs
- Bid Tab 2024-033 Building Demo
- Bid Tab 2024-033 Asbestos
- Bid Tabulation 2024 Sidewalk Program
- Bid Tab 2025-012 Trail Repair
- Bid Tabulation 2025-013 Phase 2
- Bid Tabulation 2025-013 Phase 1
- Bid Tab 2025-004 Justin Dr Preservation
- Bid Tabulation 2025 Storm Sewer Intake
- Bid Tabulation 2023-022 Stream Bank Stabilization
- Bid Tab Community Entrance Signs Phase 4
- Bid Tabulation WCRP Trail and Bridge
- Bid Tabulation 2023-027 Hopkins Road
- Bid Tab 2024 Sanitary Sewer Lining Program
- Bid Tab South Karen Acres Restroom
- Bid Tabulation 2024 ADA
- Bid Tabulation 2024 Looped Fiber
- Bid Tabulation 2024-014 114th St Sidewalk Aurora to Meredith
- Bid Tabs 2021-007 Hickman Trail Viaduct
- Bid Tab 2024-007 Meredith Dr Preservation
- Bid Tab 2024-017 Trail Repairs
- Bid Tabulation 2024-011 phase 3
- Bid Tabulation Douglas Avenue Urbanization
- Bid Tabulation 2023-004 Merle Hay Reinvestment District Stormwater Improvements
- Bid Tabulation 2024 Storm Sewer Intake Rehabilitation Program
- Bid Tabulation 2024-006 Urbandale Avenue Trail-68th to 70th
- Bid Tabulation 2024-010 Parkview Creek Trail Replacement
- Bid Tabulation 2023 Sidewalk Repair Program
- Bid Tabulation 2024-011 PCC Patch Phase 1
- Bid Tabulation 2024-011 PCC Patch Phase 2
Bid Tabulations - Construction 2023 Bids
- Bid Tab Storm Water Outfalls 2021-020
- Bid Tab 6350 Douglas Ave Demo
- Bid Tab 2023-P008 Lions Park Splash Pad
- Bid Tabulation 128th St Culvert 2023-029
- Bid Tab Community Entrance Signs Phase 3
- Bid Tabulation Trail Repair
- Bid Tab 2023 Traffic Signal Program
- Bid Tab FD EQ21-01 Trench Project
- Bid Tab 156th Street Signals.pdf
- Bid Tab 2023 Patch Phase 1 PCC East
- Bid Tab 2023 Patch Phase 2 Roundabout
- Bid Tab 2023 Patch Phase 3 PCC West
- Bid Tab 2023-005 Aurora Avenue Preservation
- Bid Tab 2023-018 Looped Fiber
- Bid Tab 2023-024 Storm Sewer Intake Rehab
- Bid Tab 2022 Sidewalk Program
- Bid Tab 2023 ADA Improvements Plan
- Bid Tab 2023-010 Parkview Creek Trail Replacement
- Bid Tab Acadia Park
- Bid Tab 100th Culvert Demo
- Bid Tab North Walnut Creek Stabilization
- Bid Tab PV Solar Array
- Bid Tab Satellite Salt Storage
- Bid Tab 2023 Sanitary Sewer Lining Program
Bid Tabulations - Construction 2022 Bids
- Bid Tab 2022 Sanitary Sewer Spot Repair Program.pdf
- Bid Tab 2022 Sanitary Sewer Lining Program.pdf
- Bid Tab 2022-015 Sharon Heights Trail Repair
- Bid Tab 2022 Traffic Signal Improvements.pdf
- Bid Tab WCRP Trail SW Interior Loop.pdf
- Bid Tab - 2022 ADA Improvement Program
- Bid Tab PCC Patch Phase 2
- Bid Tab Douglas Plantings 2022-006
- Bid Tab Glen Eagles Trail Repair 2022-015
- Bid Tab Sylvan Ridge Trail Repair 2022-015
- Bid Tab 2021 Sidewalk Program
- Bid Tab Aurora-104th-100th Widening 2022-03
- Bid Tab Coyote Ridge Trail Phase 2
- Bid Tab PCC Patch Phase 1
- Bid Tab Storm Intake Rehab 2022-016
- Bid Tabulation - 2022 Battery Backup Project
Bid Tabulations - Past Years
- Bid Tab 2016 Sidewalk Repair Program
- Bid Tabulation - 2017 Traffic Signals Improvement
- Bid Tab- Pedestrian Head Upgrade
- Bid Tab - Memorial Tree Park Trail Replacement
- Bid Tabulation - Douglas Ave Gateway Enhancements
- Bid Tabulation - Douglas Parkway and 142nd Street Pavement Improvements
- Bid Tabulation - 75th Street and Douglas Ave Intersection Improvements
- Bid Tab- Waterford Rd, Aurora Ave Sidewalk, 170th St. Ditch
- Bid Tabulation - 86th St Retaining Wall
- Bid Tab-2017 Sidewalk Repair Program
- Bid Tab- 2018 Concrete Purchase
- Bid Tabulation - Battery Backup Project
- Bid Tabulation - Traffic Signal Improvements
- Bid Tabulation - Claiborne Circle Trail Replacement
- Bid Tabulation - Meredith Fiber Project
- Bid Tabulation - 2018 Storm Sewer Intakes
- Bid Tabulation- Bent Creek Ridge Trail
- Bid Tabulation - 2018 PCC Patch Phase 1
- Bid Tabulation - 2018 PCC Patch Phase 2
- Bid Tabulation- 2018 Sanitary Sewer Lining Program
- Bid Tabulation- 2018 Stormwater Project
- Bid Tabulation- 2018 Sanitary Sewer Spot Repair Program
- Urbandale Fire station 43 - Bid-Tab Final Results
- Bid Tabulation- Northpark Water Main
- Bid Tab-72nd Street Reconstruction Project
- Bid Tab - 104th Street Reconstruction Project
- Bid Tabulation-Meredith Drive, 156th to 170th Street
- Bid Tabulation - 2019 Storm Sewer Intakes
- Bid Tabulation- 2019 PCC Reconstruction Program
- Bid Tabulation- 86th Street Preservation Phase II
- Bid Tab 2018 Sidewalk Repair Program
- Bid Tabulation - 2019 Traffic Signal Improvements
- Bid Tab 2019-022 Fire Station 41 Patching
- Bid Tab 2019-023 ADA Improvements
- Bid Tab Northpark Drive Trail 86th to 100th Street
- Bid Tabulation- 2019 Sanitary Sewer Lining Program
- Urbandale PPWMF - Bid Tab
- Bid Tabulation All-Inclusive Playground.pdf
- Bid Tab-2019-08-05-Douglas Avenue Frontage Road Right-In Right-Out Access
- Bid Tabulation - Stormwater Repair Project
- Bid Tab San Sewer Spot Repair Program
- Bid Tab 2019 Stormwater Project
- Bid Tabulation - Meredith Fiber Project
- Bid Tabulation - 6614 Boston Ave Acquisition and Demolition
- Bid Tab 112th St and Meredith Dr Signal
- Bid Tabulation 2019 Sidewalk Program
- Bid Tabulation 2020 Patch Program Phase 1
- Bid Tabulation 152nd Street Trail
- Bid Tabulation Storm Sewer Intake Rehabilitation Program
- Bid Tabulation Restroom Improvements- Northview Park
- Bid Tab 2020 Traffic Signal Improvements
- Bid Tabulation 2020 Patch Program Phase 2
- Bid Tabulation 2020 ADA Improvements
- Bid Tab WCRP Parking Lot 2020-009
- Bid Tab 2019-011 Community Entrance Signage.pdf
- 2020 Sanitary Sewer Lining Program Bid Tab
- Bid Tab - Parks and Public Works Satellite Facility
- Bid Tab - 2020 Fiber Project
- Bid Tab 2020-03 Waterford Road 142nd St to 156th St
- Bid Tab PCC Project Phase 1 West
- Bid Tab PCC Project Phase 2 East
- Bid Tab Storm Sewer Intakes
- Bid Tabulation 2021 Community Entrance Signs
- Bid Tabulation - Traffic Signal Controllers
- Bid Tabulation Cross Creek Drainage
- Bid Tab Coyote Ridge Trail Phase 1
- WCRP Community Open Space bid tab
- Murphy-Deer Ridge Bid tab
- Bid Tab 2021 Traffic Signal Improvements
- Bid Tab 2020 Sidewalk Program
- Bid Tab Police Drainage Improvements
- Bid Tab 2021 ADA Improvements
- Bid Tabulation WCRP Park Shelter - East Side
- Bid Tab FS 43 Masonry Repairs
- 128th St Sidewalks Bid Tab
- 2021 HMA Project Bid Tabulation
- 2020 Stormwater Project Bid Tab
- Douglas Ave Urbanization - North Walnut Creek to 100th St Bid Tab
- 2021 Sanitary Sewer Lining Program Bid Tab
- Urbandale City Hall HVAC Improvements Bid Tab
- Bid Tabulation 2021 Sanitary Sewer Spot Repair Program
- Beaver Creek Bank Stabilization Bid Tab.pdf
-
Engineering
Physical Address
3600 86th Street
Urbandale, IA 50322
Phone: 515-278-3950
-
Public Works
Physical Address
9401 Hickman Road
Urbandale, IA 50322
Phone: 515-278-3950